SF Giants Security Upgrades

General Contractor

San Francisco Giants

Architect

Kurt Worthington

Budget

$2,000,000

Duration

3 weeks

Completion Date

June 2017

Project Summary

Due to the changing nature of threats to heavily populated public venues, there has been a need for increased security and protection. The San Francisco Giant’s Baseball Organization contracted Pacific Structures to install 400, rated, security bollards around the entire perimeter of AT&T park. These American-made, steel, anti-vehicle bollards include a 5’x7′ welded steel foundation installed beneath the existing sidewalk. During design development with the manufacturer, Build Group coordinated installation that worked around existing utilities to ensure a uniform and consistent perimeter could be maintained.